    Introduction
    Methodology
    Implementing Measures
    Frequently Asked Questions
    The Working Plan


    Information on development of implementing measures will be added when this is available, and this section will be updated as there is further news. Details are given here once product preparatory studies are complete.  The EC released on the 30th of January 2008 an indicative plan of the adoption process of possible implementing measures for the different product groups. The Commission have stated that the plan is approximate, and subject to change as the planning is adjusted to the real advancement of preparatory work. The document can be found here.


    Product Web Link

    Latest News

     Next Major Event

    Boilers and combi-boilers (gas/oil/electric), Lot 1

     

    http://www.ecoboiler.org/

     

    Consultation Forum meeting held on 29th February 2008 which discussed the Commission working document.

    Second Consultation Forum on revised working document and proposed labelling working document held on 24th & 25th June 2009.

    EC minutes of both Consultation Forums to be published.

    Implementing Measures to be discussed by Regulatory Committee expected to be scheduled for June 2010.

    Water heaters (gas/oil/electric), Lot 2

     

    http://www.ecohotwater.org/

     

    Consultation Forum held on 29th February 2008 which discussed the Commission working document.

    Second Consultation Forum on revised working document (& Annex IV) held on 8th July 2008. Annex IV revised on 16th September 2008.

    EC minutes of both Consultation Forums to be published.

    Implementing Measures to be discussed by Regulatory Committee expected to be scheduled for June 2010.

    Personal Computers (desktops and laptops) and computer monitors, Lot 3

    http://www.ecocomputer.org/

     

    Consultation Forum held on 9th October 2009 which discussed the Commission working documents on computers & monitors.

    EC minutes of Consultation Forum to be published.

    Implementing Measures to be discussed by Regulatory Committee expected to be scheduled for May 2010.

    Imaging equipment: copiers, faxes, printers, scanners, multifunctional devices, Lot 4

    http://www.ecoimaging.org/

     

    Consultation Forum held on 12th October 2009 which discussed the industry proposed Voluntary Agreement (with explanatory notes).

    EC minutes of Consultation Forum to be published.

    Revised Voluntary Agreement to be proposed by industry.

    Consumer electronics: televisions, Lot 5

    http://www.ecotelevision.org/

     

    Consultation Forum meeting held on 16th October 2008 which discussed the Commission working document.

    Regulatory Committee held on 30th March 2009 agreed the draft Implementing Measure and Labelling Directive (see here).

    Following European Parliament scrutiny, the final eco-design regulation was published in Official Journal on 23rd July 2009 (see here) and entered into force 20 days later on 12th August 2009.

    However the energy label proposal was rejected by the European Parliament on 6th May 2009. 

    EC minutes of Consultation Forum to be published.

    Commission Regulation (EC) No 642/2009 of 22nd July 2009 can be viewed here.

    A Consultation Forum to discuss the revised TV energy label proposal is expected to be scheduled for July 2010.

    Standby and off-mode losses of EuPs, Lot 6

     http://www.ecostandby.org/

     

    Consultation Forum meeting held on 19th October 2007 which discussed the Commission working document. Minutes of the meeting are available here.

    Regulatory Committee held on 7th July 2008 agreed the draft Implementing Measure.

    Following European Parliament scrutiny, the final regulation was published in Official Journal on 17th December 2008 (see here) and entered into force 20 days later on 6th January 2009.

    Commission Regulation (EC) No 1275/2008 of 17th December 2008 can be viewed here.

    Draft guidelines published in July 2009. 

     

    Battery chargers and external power supplies, Lot 7

    http://www.ecocharger.org/

     

    Consultation Forum meeting held on 22nd February 2008 which discussed the Commission working document. Minutes of the meeting are available here.

    Regulatory Committee held on 17th October 2008 agreed the draft Implementing Measure (see here).

    Following European Parliament scrutiny, the final regulation was published in Official Journal on 7th April 2009 (see here) and entered into force 20 days later on 27th April 2009. 

    Commission Regulation (EC) No 278/2009 of 6th April 2009 can be viewed here.

    Tertiary lighting (covers office lighting, Lot 8 & (Public) street lighting, Lot 9)

     http://www.eup4light.net

     

    Consultation Forum meeting held on 18th December 2007 which discussed the Commission working document on office lighting. Minutes of the meeting are available here.

    Consultation Forum meeting held on 22nd June 2007 which discussed the Commission working document on street lighting. Minutes of the meeting are available here.

    Regulatory Committee held on 26th September 2008 agreed the draft tertiary lighting Implementing Measure (see here).

    Following European Parliament scrutiny, the final Regulation was published in Official Journal on 24th March 2009 (see here) and entered into force 20 days later on 13th April 2009.  

    Amendments (with explanatory note) to the Regulation were discussed at a Consultation Forum on 15th September 2009 (along with further amendments from ELC/CELMA).

    Amendments to the Regulation were discussed at a Regulatory Committee on 7th January 2010. The post-committee text is available here.

    Commission Regulation (EC) No 245/2009 of 18th March 2009 can be viewed here.

     

    Residential room conditioning appliances (aircon and ventilation), Lot 10

    http://www.ecoaircon.eu

     

     

    Consultation Forum meeting held on 22nd June 2009 which discussed the Commission working document.

    EC minutes of Consultation Forums to be published.

    Implementing Measures to be discussed by Regulatory Committee expected to be scheduled for June 2010.

    Electric motors 1-150 kW, water pumps (commercial buildings, drinking water, food, agriculture), circulators in buildings, ventilation fans (non-residential), Lot 11

    http://www.ecomotors.org

     

     

    Consultation Forum meeting held on 27th (motors and fans) and 29th (pumps and circulators) May which discussed the Commission working documents for motors, fans, pumps & circulators.

    Regulatory Committee held on 11th March 2009 agreed the draft Implementing Measures for motors & circulators (see here & here).

    Following European Parliament scrutiny, the final regulations for motors & circulators were published in Official Journal on 23rd July 2009 (see here) and entered into force 20 days later on 12th August 2009. 

    EC Minutes of Consultation Forum to be published.

    Commission Regulation (EC) No 640/2009 of 22nd July 2009 (motors) can be viewed here.

    Commission Regulation (EC) No 641/2009 of 22nd July 2009 (circulators) can be viewed here.

    Implementing Measures for fans currently scheduled for discussion by Regulatory Committee in March 2010 and in May 2010 for pumps.

    Commercial refrigerators and freezers, including chillers, display cabinets and vending machines, Lot 12

    http://www.ecofreezercom.org

     

    Preparatory study final report has been available since 27th December 2007. Report available here.  

    Commission working document expected to be scheduled for discussion in autumn 2010.

     

    Domestic refrigerators and freezers, Lot 13

     

    http://www.ecocold-domestic.org/

     

    Consultation Forum meeting held on 5th December 2008 which discussed the Commission working document.

    Regulatory Committee held on 30th March 2009 agreed the draft Implementing Measure and Labelling Directive (see here).

    Following European Parliament scrutiny, the final eco-design regulation was published in Official Journal on 23rd July 2009 (see here) and entered into force 20 days later on 12th August 2009.

    The energy label proposal was adopted by the European Parliament on 6th May 2009. 

    EC Minutes of Consultation Forum to be published.

    Commission Regulation (EC) No 643/2009 of 22nd July 2009 can be viewed here. 

    A Consultation Forum to discuss the revised refrigerating appliances energy label proposal is expected to be scheduled for July 2010. 

    Domestic dishwashers and washing machines, Lot 14

     

    http://www.ecowet-domestic.org/

     

    Consultation Forum meeting held on 4th December 2008 which discussed the Commission working document on washing machines and dishwashers.

    Implementing Measures for washing machines were discussed by Regulatory Committee on 31st March 2009.

    EC Minutes of Consultation Forum to be published.

    Implementing Measure on eco-design & labelling for washing machines agreed in Regulatory Committee on 31st March 2009 (see here). Currently undergoing European Parliament scrutiny.

    Implementing Measures for washing machines & dishwashers to be discussed by Regulatory Committee expected to be scheduled for March/April 2010.

    A Consultation Forum to discuss the revised washing machine & dishwasher energy label proposals is expected to be scheduled for July 2010. 

    Laundry Dryers, Lot 16

     http://www.ecodryers.org

    Preparatory study final report was published on 30th June 2009. Report available here.

     

    Commission working document expected to be scheduled for discussion in autumn 2010.

    Vacuum cleaners, Lot 17

    http://www.ecovacuum.org

    (off-line)

    Preparatory study final report has been available since March 2009.
    Commission working document expected to be scheduled for discussion in autumn 2010.

    Complex set-top boxes (Complex STBs), Lot 18

     http://www.ecocomplexstb.org/

    Consultation Forum held on 12th October 2009 which discussed the industry proposed Voluntary Agreement (with explanatory notes).

    EC Minutes of Consultation Forum to be published.

    Revised Voluntary Agreement to be proposed by industry.

    Simple converter boxes for digital television (Simple STBs), Lot 18a

     

    http://www.ecostb.com

    (off-line)

     

    Consultation Forum meeting held on 22nd February 2008 which discussed the Commission working document. Minutes of the meeting are available here.

    Regulatory Committee held on 26th September 2008 agreed the draft Implementing Measure (see here).

    Following European Parliament scrutiny, the final regulation was published in Official Journal on 5th February 2009 (see here) and entered into force 20 days later on 25th February 2009.

    Commission Regulation (EC) No 107/2009 of 4th February 2009 can be viewed here.

     

     

    Domestic lighting (Part 1), Lot 19

    http://www.eup4light.net

     

    EC minutes of Consultation Forum meeting held on 28th March 2008 which discussed the Commission working document are available here.

    Regulatory Committee held on 8th December 2008 (see here) agreed the draft Implementing Measure (also see technical briefing).

    Following European Parliament scrutiny, the final regulation was published in Official Journal on 24th March 2009 (see here) and entered into force 20 days later on 13th April 2009.

    Commission Regulation (EC) No 244/2009 of 18th March 2009 can be viewed here.

    Domestic lighting (Part 2), Lot 19 http://www.eup4light.net Final project report published on website in November 2009. Commission working document expected to be scheduled for discussion in May 2010.

    Machine tools, ENTR Lot 5

     

    No website available

     

    Preparatory study has not yet commenced.

    Industry proposed Voluntary Agreement was discussed at a Consultation Forum on 17th November 2009.

     

    EC minutes of Consultation Forum to be published.

    Awaiting appointment of consultant for preparatory study.

    Medical imaging equipment (no Lot number)

    No website available

    No preparatory study has been undertaken. 

    Industry proposed Voluntary Agreement was discussed at a Consultation Forum on 17th November 2009.

     

    EC minutes of Consultation Forum to be published.

    Revised Voluntary Agreement to be proposed by industry.



    return